Music City Loop

Downtown → BNA · tunnel tracker

Add your Google Maps API key

Open index.html and set GOOGLE_MAPS_API_KEY near the top of the script. Enable both Maps JavaScript API and Directions API on the key for road-snapped routing.

Data: built-in defaults

Reported as of today. MB1 is estimated by applying MB2's daily rate to MB1's launch date. Launch dates: MB1 Feb 25, MB2 Jun 20 (hard-coded).

Tunnel 1 · Prufrock-MB1
Current station
Complete
Footage
Pace
Days digging
Tunnel 2 · Prufrock-MB2
Current station
Complete
Footage
Pace
Days digging
vs. advertised schedule
On-schedule STA
Required pace

Advertised: system operating spring 2029. Default target assumes tunneling wraps 3–4 months earlier for station fit-out and commissioning. The amber diamond on the map marks where the lead machine should be today to hit the target date.

What-if pace
12 ft/d

Lead machine's BNA arrival at that sustained pace. Prufrock design speed claim: ~1 mi/week (≈754 ft/day).

Route: approximate — enable Directions API for road-snapped